See How Simple It Is to Install a TESUP Wind Turbine

See How Simple It Is to Install a TESUP Wind Turbine

Renewable energy is finding its place in every corner of the world. Recently, a TESUP Atlas wind turbine system was installed in Amasya, showcasing how wind and solar power can be combined into one seamless solution. This example highlights the key stages of the installation.

Introduction to the System

The TESUP Atlas wind turbine is designed as a hybrid energy solution. Along with flexible solar panels, optional sensors, and IoT connectivity through the MyTESUP App, the installation in Amasya demonstrates how easily homes can gain reliable and continuous clean energy.

For a complete guide to assembly steps and other important information, you can explore The Book by TESUP .

Step 1: Turbine Assembly and Body Installation

The installation began with assembling the turbine and securely fixing the body to a solid surface. A strong foundation ensures stability, safety, and long-term durability.

Step 2: Mounting Solar Panels

TESUP flexible solar panels were mounted on the surface to complement wind power. These panels can be installed using screws, double-sided tape, or glue. This versatility makes them adaptable to many different surfaces.

Step 3: Solar Panel Connection

The solar panels were connected to the turbine body via MC4 connectors. This hybrid setup guarantees uninterrupted energy supply, with solar power taking over when wind slows down.

Step 4: Sensor Integration

Optional devices such as an anemometer (measuring wind speed) and a pyranometer (measuring solar radiation) were connected to the dedicated “sensor” port on the turbine body. These sensors enhance monitoring and system performance.

Step 5: Inverter Connection

The turbine body was connected to the inverter with MC4 connectors, enabling the conversion of DC power into usable AC electricity.

Step 6: Inverter–Control Panel Setup

The inverter was linked to the control panel, completing the main energy system. At this stage, the household could directly benefit from the renewable electricity generated.

Step 7: IoT Pairing with MyTESUP App

The MyTESUP App was downloaded, and the QR codes on the product were scanned for pairing. This step allows real-time monitoring, performance tracking, and smart energy management.

TESUP Amasya Wind Turbine Installation Image 3

Important Notes from the Installation

  • For off-grid use or operation with the manual hand-crank accessory (without blades), pairing must be done while the system is actively generating energy.
  • A stable Wi-Fi connection is essential for pairing and IoT functionality.

Conclusion

This installation in Amasya demonstrates how the TESUP Atlas wind turbine can be set up efficiently, combining wind and solar power with modern IoT technology. With every new project, TESUP continues to bring clean energy solutions closer to households around the world.

Explore more about our products and renewable energy solutions at tesup.com

by TESUP